Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: daixieit

218.220

Measurement 1

[Individual Assessment]

DUE DATE: 20th September 2024 at 5 pm (17:00)

Assessment description – LO’s 1, 2 & 3

Percentage Weighting – 40%

Submission and Marking:

· This assessment will be completed in two mediums, which means you will get your marks at two different stages.  You will complete your measurements and Bill of Quantities workbook in CostX and then copy some of the answers into Stream.

a. You will submit some answers via a Stream quiz.

b. The BoQ workbook will be submitted via the dropbox link provided. Ensure you save your work as Portfolio 1 – Student ID number

· To assist you answer the Stream quiz, the questions have been duplicated in this brief.  You can fill in your answers in the space allocated as you progress through the brief.  Remember though, it must reflect what is in YOUR CostX measurements, as this will be reviewed when I mark your BoQ workbook.

· Please review the marking rubric for the allocation of marks.

· All questions associated with this assessment MUST be posted to: Portfolio 1 Q&A. I will not accept any questions via “Private communication with the lecturer”.  Questions associated with how to complete the assignment are not of a private nature.  Ensure that before you post your question, you have reviewed the previous posts – it may have already been addressed.

· If you need an extension, please contact Ravindu, NOT Lara.  

· Submit your file before the deadline. Do not leave it till the last moment – computer issues are not accepted as an excuse. 

Assignment Brief

· Download the CostX drawings provided on Stream under the Assessment tab:

Portfolio One

· Create a New Building

Name: Portfolio 1 - Your Student ID Number (e.g., Portfolio 1 – 1234567)

Project: Default Project

· Add the drawings and folders. You may need to change the file names. Your folder layout should look like the image below (make sure the folder and files names are correct and the files are in the correct folder).  Do NOT use the same drawing names as mine.  Yours must be meaningful.  Imagine if you were working on a real job and had over 50 pages of plans, sections and elevations.

· Check the calibration or scale on all the drawings. Ensure all pages are set landscape, not portrait. 

 

· All measurements are to be taken in accordance with ANZSMM.

· Ensure your Dimensions Groups is set to two decimal places.